Removing And Replacing The Front Bezel; Turning The Storage Subsystem On And Off - IBM DS4800 Installation, User And Maintenance Manual

Table of Contents

Advertisement

v Confirm Fibre Channel cable loop size. (IBM specifications call for at least 3-inch
v Ensure proper Fibre Channel cable management.
v Ensure proper air flow and temperature for all components in your DS4000
Note: You can find details on many of these inspection and maintenance
In addition to these inspection and maintenance responsibilities, IBM also strongly
recommends DS4000 training for staff that supports DS4000 storage configurations.
Although training is not a part of the Health Check process, DS4000 training
reduces the potential for configuration problems and contributes to the overall
health of the system.

Removing and replacing the front bezel

The storage subsystem is equipped with a front bezel, which you must remove in
order to access the power supply and fan units and interconnect-battery unit, or to
view the indicator LEDs on the front of those units.
Figure 72 shows the following steps to remove and replace the front bezel.
1. Remove the front bezel by grasping the sides and pulling the cover toward you.
2. Install the front bezel by aligning the pins on the storage subsystem chassis
Figure 72. Installing the front bezel

Turning the storage subsystem on and off

This section contains instructions for turning the storage subsystem on and off
under normal and emergency situations.
104
IBM System Storage DS4800 Storage Subsystem: Installation, User's, and Maintenance Guide
cable loops, but it is recommended that you use 6-inch cable loops or longer.)
storage configuration.
responsibilities in the appropriate sections of this document.
with the spring-steel retainers on the cover, and then press the cover toward the
chassis until the pins snap into place.