Westinghouse bolton Owner's Manual page 9

Table of Contents

Advertisement

ETL-ES-GW-Bolton-WH16.08
eXtended dOwnrOd OPtiOn
OPCiÓn COn Varilla VertiCal MÁs larGa
8
Re-install pin into extended downrod, and slide downrod ball up to the top of the downrod. Re-install the screw to secure ball to downrod. Note: Some extended downrods
have a pre-drilled set-screw hole. If a pre-drilled hole is present in the extended downrod, tighten the set screw into the pre-drilled hole in the extended downrod. If no
pre-drilled hole exists in the extended downrod, tighten the screw against the downrod to secure the downrod ball.
Vuelva a instalar el pasador en la varilla vertical más larga y deslice la bola de la varilla hasta el extremo superior de la misma. Vuelva a insertar el tornillo de fijación para
asegurar la bola a la varilla vertical. Nota: Algunas varillas verticales más largas tienen un agujero previamente perforado para el tornillo. Si la varilla vertical más larga tiene
un agujero previamente perforado, ajuste el tornillo en el agujero previamente perforado de la varilla vertical más larga. Si la varilla vertical más larga no tiene un agujero
previamente perforado, ajuste el tornillo sobre la varilla vertical para asegurar la bola de la misma.
9

Advertisement

Table of Contents
loading

Table of Contents