3.0
Installation
•
Prior to Leaving the Job Site
Prior to leaving the Job Site
Prior to leaving the job site, verify that:
9 Service access door is properly secured to the unit.
9 The heater is clear of any objects that would interfere with the proper air circulation or that
violate the listed clearance to combustibles.
9 Manual gas shut off is ON.
9 Electrical power is ON.
9 Thermostat is set to desired temperature.
9 Properly dispose of all packaging materials.
9 Check to be sure you have all of your tools.
9 Leave the Manual with the owner or end user.
46
AG2
Series