Topping Up The Coolant - ESAB Origo Mig C420 PRO Instruction Manual

Step-controlled compact welding power source
Hide thumbs Also See for Origo Mig C420 PRO:
Table of Contents

Advertisement

GB
Welding gun
S
The welding gun's wear parts should be cleaned and replaced at regular
intervals in order to achieve trouble-free wire feed. Blow the wire guide clean
regularly and clean the contact tip.
The brake hub
The hub is adjusted when delivered, if
readjustment is required, follow the instructions
below. Adjust the brake hub so that wire is slightly
slack when wire feed stops.
S
Adjusting the braking torque:
S
Turn the red handle to the locked position.
S
Insert a screwdriver into the springs in the hub.
Turn the springs clockwise to reduce the braking torque
Turn the springs counter-clockwise to increase the braking torque. NB: Turn
both springs the same amount.
6.2

Topping up the coolant

ESAB's ready mixed coolant is recommended for use.
See accessories on page 26.
Note! Coolant must be topped up if connecting a
Push-Pull welding gun that is 6 meters in length or
longer. When adjusting the water level by topping
up, the coolant hose does not need to be
disconnected.
CAUTION
The coolant must be handled as chemical waste.
bc24de
- 15 -
© ESAB AB 2011

Advertisement

Table of Contents
loading

Table of Contents