Shield Termination-Method B.2 (Daisy Chain-Quick Term; Figure B-6 Method B.2 (Daisy Chain-Quick Term) For Shield Termination; Table B-4 Shielded Cable Preparations - (Quick Term - Garmin GTX 23 Installation Manual

Hide thumbs Also See for GTX 23:
Table of Contents

Advertisement

Table B-4 Shielded Cable Preparations – (Quick Term)
Backshell Size
1
2
3
4
5
B.5 Shield Termination-Method B.2 (Daisy Chain-Quick Term)
In rare situations where more braids need to be terminated for a connector than three per ring terminal it is
allowable to daisy chain a maximum of two shields together before coming to the ring terminal
(Figure B-6). All other restrictions and instructions for the shield termination technique set forth for
Method A.1 are still applicable.
NOTE
The maximum length of the combined braids should be approximately 4 inches.

Figure B-6 Method B.2 (Daisy Chain-Quick Term) for Shield Termination

190-00906-01
Rev. C
Number of Pins
Quick Term Min
Std/HD
9/15
15/26
25/44
37/62
50/78
Quick Term Max
(inches)
(inches)
1.25
2.25
1.5
1.5
1.5
1.5
Quick Term
Float (inches)
1.75
2.5
2.0
2.5
2.0
2.5
2.0
2.5
2.0
GTX 23 Installation Manual
Page B-9

Advertisement

Table of Contents
loading

Table of Contents