Pioneer DRM-ULV16 Service Manual page 21

Lvd scsi interface unit
Hide thumbs Also See for DRM-ULV16:
Table of Contents

Advertisement

5
4
Connect the flat cables.
Note: Be sure to connect the tagged side of the flat cable
(GRN/GRY) to the CN114 on the MMCB unit.
While plugging in the connector, hold the rear of the
MMCB unit so that the board will not bend.
MMCB Unit
CN114
4
4
CONV Unit
CN906
Flat cable
(GRN/GRY)
5
Set the LVD connector guard Assy in place then secure it
with the supplied screw.
Note: Be sure to pass the shaft through the flat cable
(ORG/WHT) then insert the end of it into the drilled hole
of the panel. After confirming that the end of the shaft is
securely inserted in the drilled hole, tighten the screw.
Drilled hole
CONV Unit
6
Unhook the cable clamp and bind the Connector Assy (4P)
for the ID and the Connector Assy (2P) for the terminating
switch together with it.
Connector Assy (4P)
5
6
Flat cable
(ORG/WHT)
4
CN910
Flat cable
(ORG/WHT)
5
Shaft
5
LVD connector guard Assy
6
Cable clamp
Connector Assy (2P)
DRM-ULV16
6
7
7
Connect the cables to the connector for the ID (CN904_4P),
the Connector for the terminating switch (CN905_2P),
and the connector for the power (CN912_6P).
CONV Unit
7
CN912
8
Connect the CN113 on the MMCB unit and the CN903 on the
CONV unit using the supplied Connector Assy (5P), as well
as the CN101 on the MMCB unit and CN911 on the CONV
unit using the supplied Connector Assy (6P).
MMCB Unit
CN113
8
8
Connector Assy (5P)
CONV Unit
CN911
9
Bind the wires with the supplied binder.
Note: Bind the wires at as far up as possible.
10
Reattach the side panel of the changer.
7
8
7
7
CN905
CN904
CN101
Connector Assy (6P)
8
8
CN903
9
8
A
B
C
D
E
F
21

Advertisement

Table of Contents
loading

Table of Contents