Potterton mersey super Installation And Service Instructions Manual page 18

Non spouted multipoint model
Hide thumbs Also See for mersey super:
Table of Contents

Advertisement

Mersey Super - Installation & Service Instructions
Page 18 of 35
d. Remove 4 fixing screws from the burner assembly (2 each side).
e. Remove 2 screws securing the front to the heating unit.
f. Pull the burner assembly slightly forwards to clear the injectors, then pull apart and
withdraw taking care not to snag the pilot assembly.
NOTE: If required, the burner assembly can be dismantled and the burner bars replaced
individually. On re-assembly ensure that the burner inlets locate in the 14 holes.
NOTE: On re-assembly of the burner assembly take care not to snag the pilot assembly.
Ensure the front face of the assembly has located on the two studs on the heating unit.
Fig. 19
Page 11
REPLACEMENT OF PARTS - Page 12
file://P:\System\DATA\Dx\DS1\installation\2551\I24-2551\I24-2551.htm
09/12/2009

Advertisement

Table of Contents
loading

Table of Contents