For Mobile Home Installs; Post Installation Checks - Lennox Hearth Products Grandview GV230 Installation And Operation Manual

Wood-burning stoves
Table of Contents

Advertisement

FOR MOBILE HOME INSTALLS:

Be sure the stove is properly grounded
Be sure the stove is properly securely
fastened to the floor
Be sure the outside air vent is free of
obstructions and has a mesh screen in place

POST INSTALLATION CHECKS

Check that all chimney pipe joints are
secured and installed according to the
manufacturers instruction.
If used, make sure the outside air kit is
properly installed and unobstructed.
Make sure the legs or pedestal are securely
fastened to the stove.
Double check all stove clearances.
Be sure bricks and baffle boards are
properly installed.
If plated accessories are used, be sure
surfaces are clean prior to firing the stove.
See Page 18
FOR YOUR OWN PROTECTION AND INSURANCE PURPOSES,
HAVE YOUR CHIMNEY AND CONNECTOR PIPE INSTALLATION
INSPECTED BY YOUR LOCAL BUILDING CODE AUTHORITY OR
FIRE MARSHAL BEFORE STARTING A FIRE IN YOUR STOVE.
NOTIFY YOUR INSURANCE COMPANY.
17

Advertisement

Table of Contents
loading

Table of Contents