For The Following Items, Take Special Care During Construction And Check After Installation Is Finished; Preparations Before Installation; Notes To The Installer; Selecting Installation Site - Daikin FXYCP20K7V1 Installation And Operaion Manual

System air conditioner
Table of Contents

Advertisement

For the following items, take special care during
construction and check after installation is finished
Tick
when checked
Is the indoor unit fixed firmly?
The unit may drop, vibrate or make noise.
Is the gas leak test finished?
It may result in insufficient cooling.
Is the unit fully insulated?
Condensate water may drip.
Does drainage flow smoothly?
Condensate water may drip.
Does the power supply voltage correspond to that shown on
the name plate?
The unit may malfunction or components may burn out.
Are wiring and piping correct?
The unit may malfunction or components may burn out.
Is the unit safely grounded?
Dangerous at electric leakage.
Is the wiring size according to specifications?
The unit may malfunction or components may burn out.
Is nothing blocking the air outlet or inlet of either the
indoor or outdoor units?
It may result in insufficient cooling.
Are refrigerant piping length and additional refrigerant charge
noted down?
The refrigerant charge in the system might not be clear.

Notes to the installer

• Read this manual carefully to ensure correct installation. Be
sure to instruct the customer how to properly operate the
system and show him/her the enclosed operation manual.
• Explain to the customer what system is installed on the site.
Be sure to fill out the appropriate installation specifications in
the chapter "What to do before operation" of the outdoor unit
operation manual.

SELECTING INSTALLATION SITE

1. Select an installation site where the following conditions
are fulfilled and that meets your customer's approval.
• Where optimum air distribution can be ensured.
• Where nothing blocks air passage.
• Where condensate water can be properly drained.
• Where the false ceiling is not noticeably on an incline.
• Where sufficient clearance for maintenance and service
can be ensured.
• Where piping between indoor and outdoor units is possible
within the allowable limit. (Refer to the installation manual
of the outdoor unit.)
• Keep indoor unit, outdoor unit, power supply wiring and
transmission wiring at least 1 meter away from televisions
and radios. This is to prevent image interference and noise
in those electrical appliances.
(Noise may be generated depending on the conditions
under which the electric wave is generated, even if 1 meter
is kept.)
2. Ceiling height
This indoor unit may installed on ceilings up to 3m in height.
3. Use suspension bolts for installation. Check whether the
ceiling is strong enough to support the weight of the
indoor unit. If there is a risk, reinforce the ceiling before
installing the unit.
(The installation pitch is marked on the paper pattern for
installation. Refer to it to check for points requiring
reinforcing.)
Space required for installation see figure 1.

PREPARATIONS BEFORE INSTALLATION

1. Relation of ceiling opening to unit and suspension bolt
position. (see figure 2)
Model
FXYCP20,25,32
FXYCP40,50
FXYCP63
FXYCP80,125
1
Decoration panel
2
Ceiling opening
3
Indoor unit
4
Suspension bolt (x4)
5
Suspension pitch
6
Unit outside dimensions
7
Panel outside dimensions
2. Make the ceiling opening needed for installation where
applicable. (For existing ceilings.)
• Refer to the paper pattern for installation for the ceiling
opening dimensions.
• Create the ceiling opening required for installation. From
the side of the opening to the casing outlet, implement the
refrigerant and drain piping and wiring for remote controller
(unnecessary for wireless type) and indoor-outdoor unit
casing outlet. Refer to each piping or wiring section.
• After making an opening in the ceiling, it may be necessary
to reinforce ceiling beams to keep the ceiling level and to
prevent it from vibrating. Consult the builder for details.
3. Install the suspension bolts. (use either a W3/8 or M10
size bolt.)
Use anchors for existing ceilings, and a sunken insert, sunken
anchors or other field supplied parts for new ceilings to
reinforce the ceiling in order to bear the weight of the unit.
Adjust clearance from the ceiling before proceeding further.
Installation example see figure 3.
1
Ceiling slab
2
Anchor
3
Long nut or turn-buckle
4
Suspension bolt
5
False ceiling
NOTE
• All the above parts are field supplied.
• For other installation than standard installation, contact
your Daikin dealer for details.
A
B
C
D
990
820
780
1030
1205
1035
995
1245
1390
1220
1180
1430
1880
1710
1670
1920
2

Advertisement

Table of Contents
loading

Table of Contents