Baxi System 100 HE Plus Installation & Servicing Instructions Manual page 23

Wall mounted powered flue condensing gas fired central heating boiler
Table of Contents

Advertisement

Facia Securing
Screws
Facia Panel
Flue Products Exhaust
Tap Rail
Gas Connection
Central Heating
Flow
Central Heating
Pressure Relief
Return
Tap Rail
Suggested Lifting Points
shown as shaded area.
DO NOT LIFT USING
THE PLASTIC FACIA
PANEL.
Fig. 25
Fibre Sealing
Washer
Fig. 26
8.0 Installation
Top Hooks
8.4
1. Remove the tape from the tap rail on the support
bracket and fit the central heating return filter (Fig. 26).
2. Lift the boiler over the support bracket using the lifting
points shown in Fig. 24 and engage onto the top hooks (see
Lifting paragraph page 4).
NOTE: When installing in Loft/Small Compartment
access for lifting the boiler from the front can be
gained for two people using the lifting points (Fig. 24).
3. To gain access to the connections between boiler and
valves, release the facia securing screws (
down the facia panel.
Support Bracket
4. Make the gas connection first. This will centralise the
boiler. The gas sealing washer is an integral part of the gas
Fig. 24
tap.
5. Insert the fibre sealing washers between the valve outlet
face and the flange on the copper bends of the water circuit
connections.
6. Tighten the connections.
8.5
1. Connect the condensate drain using the 1" BSP nut and
seal supplied.
Ensure the discharge of condensate complies with any
national or local regulations in force (see British Gas
"Guidance Notes for the Installation of Domestic Gas
Condensing Boilers".
2. The condensate outlet terminates in a 1" BSP nut and
seal for the connection of 21.5mm (
pipe which should generally discharge internally into the
household drainage system. If this is not possible, discharge
into an outside drain is acceptable.
NOTE: To ensure the correct operation and integrity
of the condensate drainage system - Carefully pour
approximately 1 cupful (250ml) of water into the flue
products exhaust, at the top of the heat exchanger
(Fig. 25) to ensure a seal is made in the trap.
Central Heating
Return Filter
Fitting The Boiler
(Fig. 24)
1
/
4
Making the Condensate Drain Connection
(see section 7.6)
3
/
in) plastic overflow
4
turn) and hinge
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents