Install Shift Lever; Mount Control Panel And Fuel Tank; Control Panel; Lock Washer 5/16 - Toro ProLine 30168 Operator's Manual

Mid-size 15 hp traction unit
Table of Contents

Advertisement

Mount Control Panel and Fuel
Tank
1.
Slide control panel over shift lever and under
bottom of rear frame (Fig. 1). Align fuel tank to
top of rear frame (Fig. 1).
Figure 1
1. Rear frame

2. Control panel

2.
Secure control panel and fuel tank to rear frame
with (4) 7/8 in. (22.5 mm) bolts, lock washers
and washers (Fig. 2).
Note:
Place transmission in neutral. Align
control panel so there is . 060 in.
(2 mm) space between panel and lever.
3.
Slide hose clamp onto fuel line (Fig. 2). Push
fuel line onto fuel tank fitting and secure with
hose clamp (Fig. 2).
3
2
1
4
Figure 2
1. Bolt 5/8–18 x 7/8"
(22.5 mm)
2. Lock washer
3. Washer
3
1
2
m–1716
3. Fuel tank
6
5
m–1717
4. Fuel line

5. Hose clamp

6. Fuel fitting

Install Shift Lever

1.
Align mounting block with flats of shaft on top
of transmission and slide onto shaft (Fig. 3).
Note:
DO NOT remove rubber washer on
transmission shaft.
2.
Slide shift lever through control panel and align
mounting hole in lever with mounting block on
transmission. Secure lever to transmission with
2 in. (51 mm) bolt and washer. Torque bolt to
115 in. lb. (13 N.m).
Figure 3
1. Mounting block
2. Shift lever
Assembly
m–2574
3. Bolt 1/4–28 x 2" (51 mm)
4. Washer
13

Advertisement

Table of Contents
loading

Table of Contents