Installing The Handle; Installing The Discharge Tunnel Plug - Toro 22168 Operator's Manual

Proline 21-inch recycler walk power lawn mower
Hide thumbs Also See for 22168:
Table of Contents

Advertisement

Installing the Handle

1. Mount the handle to the outside of the lawn mower
housing (using the bottom hole) with two bolts
(5/16–18 x 1–1/4 in.), washers, and thin nylon insert
locknuts (Fig. 2).
1
6
7
8
Figure 2
1. Bag support rod
2. Carriage bolt
3. Bag aligning plate
4. Cap locknuts (3)
5. Handle
6. Bolt, 5/16–18x1-1/4 in. (2)
7. Handle latch (2)
2. Secure the handle latches to the handle with two
5/16–18 x 1-1/2 in. bolts, washers, and nylon insert
locknuts (Fig. 2).
Note: You can adjust the handle height for comfortable
operation. Stand behind the handle to determine the
height. To adjust the handle height, position the bolts and
the locknuts that secure the handle latches to the handle
into the other mounting holes in the handle latches.
3. Slide the bag support rod through the bag aligning
plate and into the second from the top mounting holes
in the handle, and secure each end with a cap locknut
(Fig. 2).
4. Insert the carriage bolt through the bag aligning plate
and the top hole on the left side of the handle, and
secure it with a cap locknut (Fig. 2).
5. Use a cable tie to secure the control cables to the left
handle below the bag support rod.
2
3
4
5
11
9
10
12
m-3850
8. Thin nylon insert
locknut (2)
9. Bottom hole in housing
10. Washer (4)
11. Locknut (2)
12. Bolt, 5/16–18x1-1/2 in. (2)
Installing the Discharge Tunnel
Plug
1. Open the discharge door by pulling forward on the
handle and moving it rearward (Fig. 3). Hold the
discharge door handle to prevent the spring-loaded
door from closing while you insert the plug.
Figure 3
1. Discharge door handle
2. Since the plug is slightly wider than the discharge
tunnel opening, rotate the plug clockwise slightly
while inserting it (Fig. 3).
Note: Ensure that the arrow on the plug decal points
upward.
3. Push the plug all the way in until the spring clip on the
bottom of the plug clicks into place, locking the plug
securely into the discharge tunnel (Fig. 4).
Figure 4
1. Spring clip
4. Release the discharge door handle to lock the top of
the plug.
8
1
2
m–262
2. Plug rotated clockwise
1
m–275

Advertisement

Table of Contents
loading

Table of Contents