WATER BOILER
Prepare boiler location
Place the boiler:
Remove outer crate
1. Remove outer crate, leaving boiler on the crate base.
2. Remove the circulator and barometric damper cartons from the crate
base.
base behind the boiler.
4. Remove the two shipping channels by loosening and removing the four
5. Remove the jacket crosstie fastened to the crate base.
Install the leveling legs if used (required if boiler is placed on
combustible flooring)
The leveling legs must be installed if the boiler is placed on
combustible flooring.
boiler during leveling leg installation. Failure to do so could
result in severe personal injury or property damage.
Wear heavy leather work gloves when handling the shipping
channels in the following steps to avoid potential severe per-
sonal injury.
2. (Figure 2a) Insert the other channel between the boiler leg and crate
base. Place the channel directly over the crate base runner, as shown.
3. (Figure 2b) Lift the channel under the boiler leg slightly.
channel directly over the crate base runner, as shown.
5. (Figure 3) With the boiler resting securely on the two shipping chan-
completely.
seated on both shipping channels.
6. Reverse steps 2 through 4 above to remove the shipping channels. Leave
the boiler on the crate base.
7. Follow steps 2 through 6 on the back side of the boiler to install leveling
legs in the rear section legs.
8. Leave the boiler on the crate base.
Remove boiler from crate base
personal injury or property damage.
1. Attach the crosstie to the jacket side panels using the two screws located
in the barometric damper carton. Then remove the boiler from the crate
base.
Do not remove the boiler from the crate base without first
installing the jacket crosstie. The boiler wiring harnesses or
connectors could be damaged.
and 31 in this manual for the jacket removal/replacement procedure.
10
— Boiler Manual
(continued)
To install leveling legs: Insert first
shipping channel under boiler leg.
To install leveling legs: Insert second
shipping channel under other leg.
Inserting levelling legs
Part number 550-141-986/0112