Section 2 : INTRODUCTION .......................................................................................................................................... 4
2.2 CORROSIVE ATMOSPHERE ............................................................................................................................. 4
2.3 SHIPMENT INSPECTION ................................................................................................................................... 4
2.4 TO VERIFY ......................................................................................................................................................... 4
Section 3 : INSTALLATION ............................................................................................................................................ 5
3.1 SAFETY MEASURES ......................................................................................................................................... 5
3.2 LOCATION .......................................................................................................................................................... 5
3.3 CLEARANCES .................................................................................................................................................... 5
3.4 PIPING INSTALLATION ...................................................................................................................................... 6
3.5 BOILER COMPONENTS..................................................................................................................................... 6
3.6 SYSTEM SETUP ................................................................................................................................................. 9
3.7 HEATING WATER CIRCUIT ............................................................................................................................... 9
3.7.2 Flow-check valve ......................................................................................................................................... 9
3.7.3 Pressure relief valve .................................................................................................................................... 9
3.7.5 Automatic Air Vent ..................................................................................................................................... 10
3.7.6 Heating pump ............................................................................................................................................ 10
3.9 BOILER WIRING: .............................................................................................................................................. 12
3.9.1 Main power supply ..................................................................................................................................... 12
3.9.2 Heating pump wiring .................................................................................................................................. 12
3.9.3 Room thermostat wiring ............................................................................................................................. 12
3.10 WIRING DIAGRAMS ....................................................................................................................................... 14
Section 4 : CONTROL SET UP .................................................................................................................................... 16
4.1 INTRODUCTION ............................................................................................................................................... 16
4.3 INTERFACE OPERATION ................................................................................................................................ 17
4.4 COMBOMAX MODE OPERATION ................................................................................................................... 17
4.6 CONTROL SET-UP ........................................................................................................................................... 17
4.7 OPERATION IN DUAL-ENERGY. ..................................................................................................................... 18
Section 5 : OPERATION .............................................................................................................................................. 20
5.4 BOILER CONTROLLER SETTING ................................................................................................................... 21
5.5 START UP PROCEDURE ................................................................................................................................. 21
Section 6 : MAINTENANCE ......................................................................................................................................... 23
6.1 INTRODUCTION ............................................................................................................................................... 23
6.1 AT ALL TIMES .................................................................................................................................................. 23
6.2 EVERY 6 MONTHS ........................................................................................................................................... 23
6.3 YEARLY INSPECTION ..................................................................................................................................... 23
6.5 SPARE PARTS ................................................................................................................................................. 24
COMBOMAX ULTRA Electric Boiler Installation, Use and Care Manual
Table of contents
2.
, Page
(Revision june 2016)