Installing The Horizontal Stabilizer - Seagull BC-12D Assembly Manual

Table of Contents

Advertisement

INSTALLING THE HORIZONTAL
STABILIZER.
1) Using a ruler and a pen, locate the cen-
terline of the horizontal stabilizer, at the
trailing edge, and place a mark. Use a tri-
angle and extend this mark, from back to
front, across the top of the stabilizer. Also
extend this mark down the back of the
trailing edge of the stabilizer.
2) Using a modeling knife, carefully re-
move the covering at mounting slot of
horizontal stabilizer ( both side of fuse-
lage).
3) Slide the stabilizer into place in the
precut slot in the rear of the fuselage.
The stabilizer should be pushed firmly
against the front of the slot.
4) With the stabilizer held firmly in place,
use a pen and draw lines onto the stabi-
lizer where it and the fuselage sides meet.
Do this on both the right and left sides
and top and bottom of the stabilizer.
WWW.SEAGULLMODELS.COM
Draw center line
Pen.
5) Remove the stabilizer. Using the lines
you just drew as a guide, carefully remove
the covering from between them using a
modeling knife.
Remove covering.
When cutting through the covering to re-
move it, cut with only enough pressure to only
cut through the covering itself. Cutting into
the balsa structure may weaken it.
6) Using a modeling knife, carefully re-
move the covering that overlaps the sta-
bilizer mounting platform sides in the
fuselage. Remove the covering from both
the top and the bottom of the platform
sides.
7) When you are sure that everything
is aligned correctly, mix up a generous
amount of 30 Minute Epoxy. Apply a thin
layer to the top and bottom of the stabi-
lizer mounting area and to the stabilizer
mounting platform sidesin the fuselage.
Slide the stabilizer in place and realign.
.
13

Advertisement

Table of Contents
loading

Table of Contents