Control Panel Display; Ready Signals; Warning Signals - Philips Saeco HD8836 Operating Instructions Manual

Hide thumbs Also See for Saeco HD8836:
Table of Contents

Advertisement

CONTROL PANEL
DISPLAY

Ready Signals

• The machine is ready for whole bean coff ee
Green
• The machine is ready for pre-ground coff ee
Green
• The machine is in the steam dispensing
Green
• The machine is in the hot water dispensing
Green
Green
Green
Green
Green
• The machine is programming the amount of
Green
• 22 •
• 22 •
Downloaded from CoffeeMachineManual.com Manuals
brewing and hot water dispensing.
brewing.
phase.
phase.
The machine is brewing 1 espresso coff ee.
The machine is brewing 1 long coff ee.
The machine is brewing 2 espresso coff ees.
The machine is brewing 2 long coff ees.
coff ee to be brewed.

Warning Signals

• The machine is warming up to brew coff ee
and dispense hot water or steam.
Orange
• The machine is performing the rinse cycle.
Wait until the machine automatically stops
brewing the beverage.
Orange
• The machine must be descaled.
Orange
• The brew group is being reset due to machi-
ne reset.
Orange
• The coff ee bean hopper needs to be refi lled
with coff ee beans to restart the brewing
cycle.
Orange
The Intenza fi lter must be replaced with a
new one.
This message will only be dis-
played if the function is activated
Orange
in the programming mode.
The alarm is deactivated only if it is "RE-
SET" in the programming mode.
Orange

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Saeco hd8837

Table of Contents