Check Of Lev - Mitsubishi Electric MUZ-GE09NA Service Manual

Split-type air conditioners; outdoor unit
Hide thumbs Also See for MUZ-GE09NA:
Table of Contents

Advertisement

K Check of LEV (Expansion valve)
Turn ON the power supply.
<Preparation of the remote controller>
While pressing both OPERATION SELECT button
and TOO COOL button on the remote controller at the
same time, press RESET button.
First, release RESET button.
Hold down the other two buttons for another 3 sec-
onds. Make sure that the indicators on the LCD screen
shown in the right fi gure are all displayed.
Then release the buttons.
Press OPERATE/STOP (ON/OFF) button of the remote
controller (the set temperature is displayed) with the
remote controller headed towards the indoor unit. 1
Expansion valve operates in full-opening direction.
Do you hear the expansion valve "click,
click·······"?
Do you feel the expansion valve vibrate
on touching it ?
No
Is LEV coil properly fi xed to
the expansion valve?
Yes
Does the resistance of LEV
coil have the characteristics?
(Refer to 10-4.)
No
Replace the LEV coil.
NOTE: After check of LEV, do the undermentioned operations.
1. Turn OFF the power supply and turn ON it again.
2. Press RESET button on the remote controller.
OBH549F
OK.
Yes
Properly fi x the LEV coil to the expansion valve.
No
Measure each voltage between connector
pins of CN724 on the inverter P.C. board.
1. Pin (-) — Pin (+)
2. Pin (-) — Pin (+)
3. Pin (-) — Pin (+)
Yes
4. Pin (-) — Pin (+)
Is there about 3 ~ 5 VAC between each?
NOTE: Measure the voltage by an analog
tester.
Replace the expansion valve.
MSZ-GE06/09/12/15/18NA
MSY-GE09/12/15/18NA
1. Regardless of normal or abnormal condition, a short beep
is emitted once the signal is received.
Yes
57
MSZ-GE24NA
MSY-GE24NA
Replace the inverter P.C.
No
board.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents