Electrical Work - Mitsubishi Electric PUHZ-ZRP KA Series Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

6. Electrical work

6.1. Outdoor unit (Fig. 6-1, Fig. 6-2)
1 Remove the service panel.
2 Wire the cables referring to the Fig. 6-1 and the Fig. 6-2.
► Except PEA-RP200, 250, 400, 500GA
B
L N
S1
S2
S3
D
For Power
For Power
D
B
► In case of PEA-200, 250
PUHZ-200, 250
► In case of PEA-400, 500
(No.1 Outdoor)
PUHZ-200, 250
(No.2 Outdoor)
PUHZ-200, 250
► In case of PEA-200, 250
L
M
N
E
E
E
F
F
F
J
K
10
S1
A
S2
S3
A Indoor unit
B Outdoor unit
C Remote controller
C
D Main switch (Breaker)
E Earth
A
A
E
C
E
Fig. 6-1
PEA-200, 250
PEA-400, 500
T (
B
- 4
) 1
T (
B
- 4
) 2
► In case of PEA-400, 500
Q
L M
E E
E
F
Fig. 6-3
ZRP100-250
A
F Termial block
E
G Indoor/Outdoor connection terminal block (S1, S2, S3)
H Service panel
I Clamp
* Clamp the cables so that they do not contact the center of the service panel or the gas valve.
J Earth terminal
Note :
If the protective sheet for the electrical box is removed during servicing, be sure to
reinstall it.
Caution:
Be sure to install N-Line. Without N-Line, it could cause damage to unit.
N O
P Q
E E
E E
F
F
F
J
K
ZRP100-140V
ZRP100-250Y/P200, 250Y
Fig. 6-2
A Power supply
B Earth leakage breaker
C Circuit breaker or local switch
D LCD remote controller
E Outdoor unit
F Indoor unit
G Power cable wiring
H Indoor/outdoor connection wiring
I Grounding
J Main remote controller
K Subordinate remote controller
L Standard (Refrigerant address = 00)
M Refrigerant address = 01
N Refrigerant address = 02
O Refrigerant address = 03
P Refrigerant address = 14
Q Refrigerant address = 15
L N
S1 S2 S3
L1 L2 L3 N
S1 S2 S3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Puhz-p ka series

Table of Contents