Configuration Procedure - 3Com Switch 4800G 24-Port Configuration Manual

Hide thumbs Also See for Switch 4800G 24-Port:
Table of Contents

Advertisement

Figure 1-13 Network diagram for IRF virtual device configuration example
1
2
1
2
1
2

Configuration procedure

1)
The three devices are not connected. Power them on and configure them separately.
# Configure Switch 1.
<Switch1> system-view
[Switch1] irf member 1 renumber 1
Warning: Renumbering the switch number may result in configuration change or loss.
Continue?[Y/N]:y
[Switch1] irf member 1 irf-port 1 port 2
# Configure Switch 2.
<Switch2>system-view
[Switch2] irf member 1 renumber 2
Warning: Renumbering the switch number may result in configuration change or loss.
Continue?[Y/N]:y
[Switch2] irf member 1 irf-port 1 port 2
[Switch2] irf member 1 irf-port 2 port 3
# Configure Switch 3.
<Switch3> system-view
[Switch3] irf member 1 renumber 3
Warning: Renumbering the switch number may result in configuration change or loss.
Continue?[Y/N]:y
[Switch3] irf member 1 irf-port 2 port 3
2)
Power off the three devices. Connect them as shown in
on,
and
Switch 1
3
4
Switch 2
3
4
Switch 3
3
4
the
IRF
1-21
Figure 1-13
with IRF cables. Power them
virtual
device
is
formed

Advertisement

Table of Contents
loading

Table of Contents