Kohler 40COZ/33CFOZ Service Manual page 129

Marine generator set
Table of Contents

Advertisement

Terminal
1
Ground—emergency stop relay (K4)—connect
emergency stop across terminals TB1-1 and
1A *
1A
Emergency stop relay (K4) coil; negative
side—connect emergency stop across
terminals TB1-1 and 1A *
2
Ground terminal
Overcrank (OC) signal [
12
Auxiliary (AUX) signal [
26
32
Common fault/prealarm line 1—A/V alarm or
common fault relay activated by OC, 12; AUX,
26; LWT, 35; HET, 36; LOP, 38; OS, 39; AHET,
40; ALOP, 41; and LF, 63 faults
32A
Common fault/prealarm line 2—A/V alarm or
common fault relay activated by AUX, 26;
HET, 36; LOP, 38; OS, 39; and ES, 48 faults
35
Low water temperature (LWT) signal
High engine temperature (HET) signal [
36
Low oil pressure (LOP) signal [
38
Overspeed (OS) signal [
39
40
Anticipatory high engine temperature (AHET)
signal [
41
Anticipatory low oil pressure (ALOP)
signal [
42A
Battery voltage (fuse #1 protected)—
accessory power supply; customer may also
provide separate accessory power source
Emergency stop (ES) signal [
48
56
Air damper (AD) switch, if equipped
System ready signal [
60
61
Battery charger fault—connect battery charger
alarm contact to TB1-61 to activate fault lamp
(active low), if used
62
Low battery volts—connect battery charger
alarm contact to TB1-62 to activate fault lamp
(active low), if used
63
Low fuel (LF) fault—connect fuel level sensor
to TB1-63 to activate fault lamp (active low), if
used
70C
Generator in cool down mode signal
70R
Generator in running mode signal
Not in auto signal [
80
* Connect jumper across terminals 1 and 1A if emergency stop
switch is not used.
[ Use a remote annunciator and/or A/V alarm kit as an indicator
with a dry contact kit connected to controller terminal strip TB1.
Note:
Not all terminals are used for all generator sets (see
appropriate wiring diagrams for specific generator set model).
Figure 9-18 Controller TB1 Terminal Strip
(Decision-Makert 3+ Controller)
TP-5737 5/01
Purpose
Terminal
1P
Prime power operation
2P
Prime power operation
3
Remote start ground—connect transfer
switch or remote start switch to TB2-3 and
TB2-4
3P
Prime power operation
Remote start—connect transfer switch or
4
remote start switch to TB2-3 and TB2-4
4P
Prime power operation
9
Crank mode selection (open: cyclic crank,
ground: continuous crank); connect TB2-9
to TB2-9A for continuous cranking; leave
TB2-9 open cyclic cranking; see starting
instructions in Section 2, Operation.
9A
Crank mode ground
Note: To use prime power mode—place jumpers across TB2-1P to
TB2-2P, TB2-3P to TB2-4P, and TB2-3 to TB2-4. To deactivate
prime power mode—remove jumpers across TB2-1P to TB2-2P,
TB2-3P to TB2-4P, and TB2-3 to TB2-4.
Figure 9-19 Controller TB2 Terminal Strip
(Decision-Makert 3+ Controller)
Purpose