Cisco CPA2501 User Manual page 127

Hide thumbs Also See for CPA2501:
Table of Contents

Advertisement

Configuring Equipment Racks
The following tips will help you plan an acceptable equipment rack configuration:
Enclosed racks must have adequate ventilation. Ensure that the rack is not overly
congested because each unit generates heat. An enclosed rack should have louvered
sides and a fan to provide cooling air.
When mounting a chassis in an open rack, ensure that the rack frame does not block the
intake or the exhaust ports. If the chassis is installed on slides, check the position of the
chassis when it is seated all the way into the rack.
In an enclosed rack with a ventilation fan in the top, excessive heat generated by
equipment near the bottom of the rack can be drawn upward and into the intake ports of
the equipment above it in the rack.
Baffles can help to isolate exhaust air from intake air, which also helps to draw cooling
air through the chassis. The best placement of the baffles depends on the airflow patterns
in the rack, which are found by experimenting with different arrangements.
Power Supply Considerations
Check the power at your site to ensure that you are receiving "clean" power (free of spikes
and noise). Install a power conditioner if necessary.
Warning
versions of this warning, refer to the appendix "Translated Safety Warnings.")
The multiport serial router power supply includes the following features:
Autoselects either 110V or 220V operation.
All units include a 6-foot (1.8-meter) electrical power cord. (A label near the power cord
indicates the correct voltage, frequency, current draw, and power dissipation for your
unit.)
The device is designed to work with TN power systems. (To see translated
Preparing to Install the Cisco Multiport Serial Routers 2-5
General Site Requirements

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpa2514Cpa2515Cpa2502Cpa2503Cpa2504Cpa2512

Table of Contents