Pioneer PD-F957 Service Manual page 44

Hide thumbs Also See for PD-F957:
Table of Contents

Advertisement

PD-F957,PD-F907
QQ
3 7 63 1515 0
INSTALLING THE LOADING MECHANISM ASSY
1
The projection of the Drive Plate
should be engaged with the
corresponding part of the slider
TE
L 13942296513
INSTALLING THE DISC RACK
1
Disc Rack
www
Place the Disc Rack below
the hook of the Mecha Base,
then let the center hole of the Disc
.
Rack pass through the Center Boss.
44
http://www.xiaoyu163.com
The hook of the Mecha Base should
should be on the top of the Disc Rack
x
ao
u163
y
Center Boss of the
i
Mecha Base
http://www.xiaoyu163.com
2 9
8
Loading Mechanism Assy
Slider
Q Q
3
6 7
1 3
1 5
The Gear should be
engaged with Disc Rack
co
Mecha Base
.
9 4
2 8
0 5
8
2 9
9 4
2 8
Loading Mechanism Assy
Gear
m
9 9
9 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pd-f907Pd-f905

Table of Contents