Commissioning
▶ Turn off the electrical supply.
▶ Isolate the oil supply to the burner.
▶ Remove the oil pressure gauge.
▶ Refit the blanking plug (A).
▶ Check and rectify any oil leaks.
3. Switch on the oil supply.
▶ Switch on the electrical supply.
▶ Restart the boiler and run for 5 minutes.
▶ Recheck the CO
levels and if required, adjust the air shutter setting
2
(L) to obtain the correct CO
level.
2
▶ Refit the sample point cap (hand tighten only, do not over tighten)
and refit the burner cover.
G
D
RIELLO
RDB OIL PUMP
C
B
A
Fig. 67
Nominal boiler rating at normal operating temperature using 28 second kerosene
Oil pump
pressure
Nozzle
(bar/psi)
Boiler 12/18 RDB 2.2
0.35x80°SR
9/132
0.45x60°ES
7.5/110
0.55x80°EH
7.8/115
Boiler 18/25 RDB 2.2
0.50x80°ES
8.5/125
0.60x60°ES
8.5/125
0.75x80°ES
7.5/110
Boiler 25/32 RDB 2.2
0.75x80°ES
7.5/110
0.75x80°ES
10/147
0.85x80°EH
9.5/140
Table 8 Burner information
APPLIANCE MUST BE SET TO CO
AIR SETTINGS GIVEN ARE APPROXIMATE ONLY, AS FLUE LENGTH AND NOZZLE VARIATIONS WILL AFFECT THIS.
38
L
6720808218-61.1Wo
Fuel flow rate
Approx.
flue gas
kg/h
l/h
temp. °C %CO
1.04
1.32
72
1.28
1.63
77
1.54
1.96
80
1.58
1.96
76
1.84
2.33
81
2.15
2.72
87
2.15
2.72
79
2.45
3.11
81
2.75
3.48
86
LEVELS.
2
Approx
Input
Output Air damper
air
setting
kW
kW
2
11.0
3.0
12.3
12.0
11.5
5.0
15.4
15.0
12.0
5.0
18.5
18.0
11.5
3.0
18.5
18.0
12.0
3.5
22.1
21.5
12.0
4.5
25.7
25.0
11.5
3.5
25.7
25.0
12.0
4.5
29.4
28.5
12.5
5.0
33.0
32.0
Greenstar Danesmoor Utility
ErP
disk
setting
Burner head
12/15
LD2X Short
12/15
LD2X Short
18
LD2X Short
18
LD2SX Short
21.5
LD2SX Short
25
LD2SX Short
N/A
T2 Short
N/A
T2 Short
N/A
T2 Short
and Utility System
ErP
- 6 720 813 286 (2014/09)