Extreme Networks E4G-200 Installation Manual page 39

Hide thumbs Also See for E4G-200:
Table of Contents

Advertisement

DB-9-to-RJ-45 adapter
Two pluggable DC terminal block connectors (Dinkle part number 2ESDVM-03P)
Recommended insulation colors are:
Green, or green with yellow stripe, for the ground connection
Red and black for the power and return connections
Have the additional items on hand before you begin the installation:
Connection hardware appropriate to the installation site:
Hardware for connecting the ground wire to the site grounding point
Hardware for connecting the power wires to the DC source
Stripping tool
Torque screwdriver and wrench or torque driver with attachments for tightening screws
The ground lug requires a 1/4-inch screwdriver tip.
The screws on the DC power connector require a 1/8-inch straight screwdriver tip.
Installing the E4G-200 Router in a Rack
The E4G-200 router is installed in a standard equipment rack.
Two rack-mounting brackets, and eight screws, are provided in the product packaging.
To rack-mount the E4G-200 router, follow these steps:
1
Decide which position (front-mount or mid-mount) is most suitable for the installation.
Position the mounting brackets as shown in
Figure 16: Positions for the Mounting Brackets
2 On each side of the router, use the screws provided to attach a mounting bracket in the selected
mounting position.
E4G Routers Hardware Installation Guide
Installing an E4G Series Router
the following
figure.
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

E4g-200-12xE4g-400

Table of Contents