Sharp KB-5121KS Service Manual page 24

Cook top with microwave drawer
Hide thumbs Also See for KB-5121KS:
Table of Contents

Advertisement

KB-5121KS/K/W
PROCEDURE
LETTER
J
SECONDARY INTERLOCK SWITCH TEST
1. Disconnect the power source.
2. Open the drawer and keep it open.
3. To discharge high voltage capacitor, wait for 60 seconds.
4. Isolate the switch and connect the ohmmeter to the common (COM.) and normally open (NO) terminal
of the switch. The meter should indicate an open circuit with the drawer open and a closed circuit with
the drawer closed. If improper operation is indicated, replace the secondary interlock switch.
5. Reconnect all leads removed from components during testing.
6. Reassemble the unit.
7. Reconnect the power source.
8. Run the oven and check all functions.
K
STOP SWITCH TEST
STOP SWITCH
1. Disconnect the power source.
2. Open the drawer and keep it open.
3. To discharge high voltage capacitor, wait for 60 seconds.
4. Isolate the switch and connect the ohmmeter to the common (COM.) and normally open (NO) terminal
of the switch. The meter should indicate an open circuit with the drawer open and a closed circuit with
the drawer closed. If improper operation is indicated, replace the stop switch.
5. Reconnect all leads removed from components during testing.
6. Reassemble the unit.
7. Reconnect the power source.
8. Run the oven and check all functions.
NOTE: If the stop switch contacts fail in the open position and the door is closed, the cooling fan motor,
L
MONITOR SWITCH TEST
1. Disconnect the power source.
2. Open the drawer and keep it open.
3. To discharge high voltage capacitor, wait for 60 seconds.
4. Before performing this test, make sure that the secondary interlock switch, according to the above
Switch Test Procedure. Disconnect the wire lead from the monitor switch (COM) terminal. Check the
monitor switch operation by using the ohmmeter as follows. When the drawer is open, the meter should
indicate a closed circuit. When the monitor switch actuator is pushed by a screw driver through the
lower latch hole on the front plate of the oven cavity with the drawer opened (in this condition the
plunger of the monitor switch is pushed in), the meter should indicate an open circuit. If improper
operation is indicated, the switch may be defective and both the monitor switch, plus fuse will need
to be replaced. After testing the monitor switch, reconnect the wire lead to the monitor switch (COM)
terminal and check the continuity of the monitor circuit.
5. Reconnect all leads removed from components during testing.
6. Reassemble the unit.
7. Reconnect the power source.
8. Run the oven and check all functions.
Ohmmeter
TEST PROCEDURES
stirrer motor and oven light will be activated by RY1.
COMPONENT TEST
M M O O N N I I T T O O R R
S S W W I I T T C C H H
( ( B B L L K K ) )
( ( R R E E D D ) )
( ( B B R R N N , , G G R R Y Y ) )
( ( B B R R N N , , B B L L K K ) )
S S E E C C O O N N D D A A R R Y Y
I I N N T T E E R R L L O O C C K K
S S W W I I T T C C H H
22
Screw Driver

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kb-5121kkKb-5121kw

Table of Contents