Boiler Connections 21 ·22 - Worcester Greenstar 12i System Instruction Manual

Wall hung rsf gas fired condensing boiler
Hide thumbs Also See for Greenstar 12i System:
Table of Contents

Advertisement

1
• •
• •
Do
not
li~
by
the
22mm
22mm bonded
washer
2mm
.......
• •
BOILER CONNECTIONS
• •
Handling
Hole
BOILER CONNECTIONS
IMPORTANT: IF FmiNG OPTIONAL
INTEGRAL
DIVERTER VALVE
Disregard
this
and
the following
page and
refer
to
the
correct
version
for installing
the
Integral dlver ter
valve
In
the
ADDITIONAL
I
NFORMATION
section
at
the
back
of this
book.
GAS
AND
WATER
CONNECTIONS:
Remove
templare Md secure lhe
waJI
mourOlg
frame
to
the
wat
with the fixings supplied.
System
pipes
may
be run
Yeftical~
upwards
behind
the boiler
or
below
it.
See
F'lumbing
Man~old
Section
on page
15.
A
Aow (22mm),
B
Return
(22mm),
C •
Gas
inlet
(22mm)
• 1.
Fit
sealing
washers
to service valves
before hanging boiler.
IMPORTANT:
Before hanging the boiler onto the wall
mounting frame ensure
that
the
pressure
relie
f
vatve
connection
is
(n
the
DOWN
position.
This
is
located on the
right
hand
side
of
the wall
frame
at the rear.
• 2.
PuU the
extended
tab/ lever
forward
and
down
until
there
is no further
travel.
2
3.
Hang the
boiler
on to
the
wall mounting
frame
by the
two
brackets
positioned
left
and
right
at
the
top
rear
of
the
appliance.
Oo
not lift the appliance
by
the
ai1 gM
manifold
.
There
are
two
handling
hc:lles
incorporated into
the inner casing
left
and
right
in
the
lower
section
o
f
the
apprrance.
IMPORTANT:
The p
ressur
e
relief
connector
must
b
e
repositioned after the
boiler
has been
correctly
mounted to t
he
wall
mounti:ng
frame
.
4.
Push
the lever
on
the
pressure
relief
connector
UP
until
the
stop on
t
he
inside
of
the
handle
is
over
the shoulder
of
the metal
bracket
to
secure
in
place .
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24i system

Table of Contents