Battery Installation & Replacement - Behringer FCV100 User Manual

Hide thumbs Also See for FCV100:
Table of Contents

Advertisement

6
FOOT CONTROLLER FCV100 User Manual
(4) By using the pedal in the NORM mode, you control the volume level in both channels.
In CV mode, the pedal controls OUTPUT 2 for a remote control of parameters such as
sound or effects.
Fig. 2.2: FCV100 controls (part 2)
(5) When the battery LED indicator dims or does not light up, you need to replace the
battery. For instructions on how to replace the battery, please refer to chapter 3
"BATTERY INSTALLATION & REPLACEMENT".
(6) Connect your instruments via the INPUTS 1/2 using the "NORM" mode. In "CV"
mode, INPUT 2 of your FVC100 can not be used since the control signal comes
exclusively from OUTPUT 2. As stated before, you may use INPUT 1/OUTPUT 1 also
in "CV" mode to control the volume level of instruments.
Fig. 2.3: FCV100 controls (part 3)
(7) The FCV100 can be operated via an 12 V DC power adapter or with a 9 V battery
(Type
6LR91). If you use a battery and the power adapter at the same time,
the FCV100 draws no power from the battery.
3. Battery Installation & Replacement
To access the battery compartment, please follow the instructions:
1. Loosen the latch screw on the underside of the FCV100 and remove the base.
2. Remove the old battery and replace it with a new one.
3. Reattach the base.
Remember to unplug the jacks when the unit is not being used so as to
conserve battery life.
(5) (6)
(7)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents