Installation Procedure - UTICA BOILERS Starfire 3 Installation Manual And Operating Instructions

Oil fired cast iron boiler
Table of Contents

Advertisement

WARNING:
WARNING:
WARNING:
WARNING:
WARNING:
maintenance can cause property damage, personal injury or loss of life.
All installations must conform to the requirements of the authority having jurisdiction.
Such applicable requirements take precedence over the general instructions of this manual.
Where required by the authority having jurisdiction, the installation must conform to the
American Society of Mechanical Engineers Safety Code for Controls and Safety Devices
for Automatically Fired Boilers, ANSI/ASME No. CSD-1. In Canada all installations must
be in accordance with the authorities having jurisdiction and CSA B139.
LOCATE BOILER in front of final position before removing crate. Provide a level solid
base as near chimney as possible and centrally located with respect to the heat distribution
system as practical.
WARNING:
WARNING:
WARNING:
WARNING:
WARNING:
FLOORING.
Allow 24 inches in the front and top for servicing and cleaning, or removing tankless
water heating coil.
When installed in a utility room, the door should be wide enough to allow the largest
boiler part to enter, or to permit replacement of another appliance such as a water heater.
FOR INSTALLATION ON NON-COMBUSTIBLE FLOORS ONLY. The boiler must not
be installed on carpeting or vinyl flooring. Minimum clearances to combustible construction
are:
TOP .............................................................. 24 IN.
FRONT ......................................................... 24 IN.
FLUE CONNECTOR ....................................... 9 IN.
REAR .............................................................. 6 IN.
SIDES ............................................................. 6 IN.
NOTE: CLEARANCE FOR ACCESS SHOULD EXCEED FIRE PROTECTION
CLEARANCE.
REMOVE CRATE and plastic protective wrapper and inspect for damage. All equipment
is carefully manufactured, inspected and packaged by experienced workers. Our responsibility
ceases upon delivery of the crated boiler to the carrier in good condition. Any claims for
damage or shortage in shipment must be filed immediately against the carrier by the
cosignee. Move boiler to permanent position by sliding or walking.
INSTALLA
INST
INST
ALLATION PR
ALLA
ALLA
TION PR
TION PROCEDURE
TION PR
INST
INST
ALLA
TION PR
Improper installation, adjustment, alteration, service or
BOILER MAY NOT BE INSTALLED ON COMBUSTIBLE
OCEDURE
OCEDURE
OCEDURE
OCEDURE
PAGE 2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents