Checking Continuity Of Fuse On Pcb Ass'y; Checking Motor Capacitor - Sanyo SAP-KRV91EH Technical & Service Manual

Inverter split system air conditioner
Hide thumbs Also See for SAP-KRV91EH:
Table of Contents

Advertisement

12-2. Checking Continuity of Fuse
on PCB Ass'y
Remove the PCB Ass'y from the electrical compo-
nent box. Then pull out the fuse from the PCB
Ass'y. (Fig. 5)
Check for continuity using a multimeter as shown
in Fig. 6.

12-3. Checking Motor Capacitor

Remove the lead wires from the capacitor terminals,
and then place a probe on the capacitor terminals as
shown in Fig. 7. Observe the deflection of the pointer,
setting the resistance measuring range of the multi-
meter to the maximum value.
The capacitor is "good" if the pointer bounces to a
great extent and then gradually returns to its original
position.
The range of deflection and deflection time differ
according to the capacity of the capacitor.
Compressor motor
capacitor
42
Fuse
PCB Ass'y
Fig. 5
Fuse
Fig. 6
Multimeter
Fan motor
capacitor
Fig. 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sap-crv91eh

Table of Contents