Datsun 510 Workshop Manual page 108

Maintenance & repair 1969-1973
Hide thumbs Also See for 510:
Table of Contents

Advertisement

Transmission
oil
pan
drain
plug
To
prevent
damage
to
the
oil
pan
insert
a
wooden block between the
pan
and
jack
Remove
the
two
bolts
attaching
the
tran
smission
to
the
rear
engine
mount
Place
a
jack
under the transmission and
remove
the
four
bolts
fixing
the
rear
engine
mounting
cross
member
to
the
body
Fig
168
Cross Member Removal
Lower the
jack supporting
the
engine
to
in
cline the
engine
in
a
rearward direction This
will allow sufficient
room
for the transmission
to
be removed
Remove the
starting
motor
and the bolts
at
taching
the clutch
housing
to
the
engine
Lower the
jack gradually
and withdraw the
transmission
INSTALLATION
Installation of the transmission is the reversal
of the
procedure given
for removal However
attention should
be
given
to
the
following
points
Notes
a
Fill the transmission with the
recommended gear oil MP 90
Oil
capacity
0
4 5
U S
gal
b
Adjust
the clutch
operating cylinder
at
the
push
rod
so
that the
play
at
the with
drawaI lever will be 0 087 in
Fig
169
4 Forward
Speed
Transmission
lD

Advertisement

Table of Contents
loading

Table of Contents