Drolet HEATPRO DF03000 Installation And Operating Instructions Manual page 32

Table of Contents

Advertisement

HeatPro Furnace Installation and Operation Manual
With plenum (B) only
32
Using
four
self-drilling
screws (D), install the
plate supplied with the
furnace on the plenum
(B). Make sure to have
the notch on the plate up.
Install the RTD probe in
the hole of the plenum
(B).
Secure the RTD probe
with two screws (C).
Connect the RTD probe
to the furnace with the
connector.

Advertisement

Table of Contents
loading

Table of Contents