Installation Planning - Desa IRONHAUS IKC42N Series Owner's Operation And Installation Manual

Table of Contents

Advertisement

INSTALLATION pLANNING

There are two basic types of direct-vent
installation:
• Horizontal Termination
• Vertical Termination
Horizontal Termination Installation
IMPORTANT: Horizontal square terminations
require only inner portion of wall firestop. Hori-
zontal installations using round termination
require exterior portion of wall firestop (see
Figure 14, page 12).
1. Set fireplace in its desired location and
determine route your horizontal venting
will take. Do not secure fireplace until all
venting has been installed. Some instal-
lations require sliding fireplace in and out
of position to make final venting connec-
tions. Figures 14 through 18 on pages 12
through 14 show different configurations
for venting with horizontal termination that
will help you decide which application best
suits your installation. Check to see if wall
studs or roof rafters are in the path of your
desired venting route. If they are, you may
want to adjust location of fireplace.
2. Direct vent pipe sections and components
are designed with special twist-lock con-
nections.
Twist-Lock procedure: Female ends of
pipes have locking lugs (indentations).
These lugs will slide straight into match-
ing slots on male ends of adjacent pipes.
Push pipe sections together and twist
one section clockwise approximately
one-quarter turn until the sections are fully
locked (see Figure 8).
Note: Horizontal runs of vent must be sup-
ported every three feet. Use wall straps
for this purpose.
3. Use a 45° elbow to connect venting sys-
tem to fireplace flue collar. The elbow is
designed to be twist-locked onto flue collar
as described in step 2. IMPORTANT: Do
not attempt to alter configuration of elbow
by cutting, twisting, bending, etc.
4. Assemble desired combination of pipe
and elbows to fireplace flue collar. If there
are long portions of venting run, pre-
assembled pipe sections may be installed
as subassemblies for convenience.
10
veNTING INSTALLATIoN
Continued
www.ironhaus.com or www.desatech.com
5. Carefully determine location where vent
pipe assembly will penetrate outside
wall. Center of hole should line up with
center line of horizontal vent pipe. Mark
wall for a 11
1
Cut and frame square hole in exterior
wall where vent will be terminated. If wall
being penetrated is constructed of non-
combustible material, such as masonry
block or concrete, a 8
clearance is acceptable (see Figure 9).
Female Locking Lugs
Figure 8 - Vent Pipe Connections
Vent Opening
Combustible Wall
11
/
"
1
2
11
/
"
1
2
Vent Opening
Noncombustible Wall
8
1
/
"
2
Figure 9 - Vent Opening Requirements
/
" x 11
/
" square hole.
1
2
2
/
" hole with zero
1
2
Male
Slots
11
/
" Inside Framing
1
2
(Framing
Detail)
Center of
Hole
121334-01A

Advertisement

Table of Contents
loading

Table of Contents