Installation; Installation Instructions; Installation Operations - Immergas CRD Instruction Booklet

Table of Contents

Advertisement

IMPORTANT
Immergas reserves the right to make improve-
ments and changes to parts and accessories,
holding good the essential characteristics of
the model described and illustrated in this
handbook.

1. INSTALLATION

1.1 Installation instructions

Installation of the CRD, including cables
and connection to the boiler, must be car-
ried out by specialised personnel. With the
initial free boiler check, when the CRD
is included in the system, the Immergas
Authorised Assistance Centre checks the
6
connection to the generator terminal block
and correct operation. The free check of
just the CRD by the Immergas Authorised
Assistance Centre is not provided for if
requested after the start of the boiler war-
ranty phase.
Important: the free boiler check does not
include the laying of the CRD wires, which
is the installer's responsibility.

1.2 Installation operations

1) Separate the fixing template from the
Digital Remote Control body by prising
with a screwdriver in the special recess
(Fig. 1).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents