Installing The Handlebar - Yamaha YZ125 2009 Owner's Service Manual

Table of Contents

Advertisement

2. Install:
• Grip cap (upper) "1"
• Grip cap (lower) "2"
• Bolt (grip cap) "3"
Temporarily tighten the bolts (grip cap).

INSTALLING THE HANDLEBAR

1. Install:
• Handlebar lower holder "1"
• Washer "2"
• Nut (handlebar lower holder) "3"
• Install the handlebar lower holder with its side
having the greater distance "a" from the
mounting bolt center facing forward.
• Apply the lithium soap base grease on the
thread of the handlebar lower holder.
• Installing the handlebar lower holder in the re-
verse direction allows the front-to-rear offset
amount of the handlebar position to be
changed.
• Do not tighten the nut yet.
2. Install:
• Handlebar "1"
• Handlebar upper holder "2"
• Bolt (handlebar upper holder) "3"
Bolt (handlebar upper holder):
28 Nm (2.8 m•kg, 20 ft•lb)
• The handlebar upper holder should be in-
stalled with the punched mark "a" forward.
• Install the handlebar so that the marks "b" are
in place on both sides.
• Install the handlebar so that the projection "c"
of the handlebar upper holder is positioned at
the mark on the handlebar as shown.
• First tighten the bolts on the front side of the
handlebar upper holder, and then tighten the
bolts on the rear side.
5-39
HANDLEBAR

Advertisement

Table of Contents
loading

Table of Contents