Fronius Acctiva Easy 1202 Operating Instructions Manual page 29

Hide thumbs Also See for Acctiva Easy 1202:
Table of Contents

Advertisement

Available languages

Available languages

If there is no start process after 30 seconds, the charger switches automatically to the al-
ternator test. If the start process is not possible, charge or check the battery.
Testing the alter-
While the engine is running, the charger checks the voltage the alternator is supplying to
nator
the battery.
(Acctiva Easy chargers
10
only)
11
Alternator voltage
OK.
12
Alternator test running. Let engine run for approx. 30 seconds at 1500-2000 rpm
Charger displays alternator test result.
Alternator voltage
OK. Possible prob-
lems on short jour-
neys or in winter.
To finish the test, disconnect from battery or connect charger to mains supply to begin
charging.
Alternator voltage
Alternator voltage
too high. Have alter-
too low. Have alter-
nator checked in
nator checked in
workshop.
workshop.
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents