F. Test High Limit Control And Adjust
While burner is operating, move indicator on high limit
control below actual boiler water temperature. Burner should
go off while circulator continues to operate. Raise limit setting
above boiler water temperature and burner should reignite
after pre purge and igniter warm-up period. Set the high limit
control to the design temperature requirements of the system.
Maximum high limit setting is 200°F. Minimum high limit set-
ting is 100°F.
G. Test Other Safety Controls
If the boiler is equipped with a low water cut off, a manual
reset high limit, or additional safety controls, test for opera-
tion as outlined by the control manufacturer. Burner should
be operating and should go off when controls are tested. When
safety controls are restored, burner should reignite.
H. Set Thermostat Heat Anticipator (If Used) And Verify
Thermostat Operation
For a single thermostat connected to the yellow thermostat
lead wires in the furnished field wiring junction box, the heat
anticipator should be set at 0.7 amps. For other wiring configu-
rations, refer to the instructions provided by the thermostat
manufacturer regarding adjustment of heat anticipator. Cycle
boiler with thermostat. Raise the thermostat to the highest
setting and verify boiler goes through normal start up cycle.
Lower thermostat to lowest setting and verify boiler goes off.
I. Measure The Natural Gas Input Rate
Correct input rate is essential for proper and efficient operation
of the burner and boiler.
1.
Determine elevation at installation site.
2.
See page 6 and 7 of this manual to determine the correct
input rate for the local elevation.
3.
Obtain the yearly average heating value of the local gas
supply from the gas utility. At sea level elevation, it should
be approximately 1000 Btu's per standard cubic foot.
4.
Operate boiler for 5 minutes.
CHECK OUT PROCEDURE AND ADJUSTMENT
5.
Turn off all other gas appliances, extinguishing standing
pilots where applicable.
6.
At gas meter, measure time in seconds required to use one
cubic foot of gas.
7.
Calculate input rate according to the following formula:
3600xheating value from step 3
Btuh inputrate = time from step 6
8.
Measured input rate should be within +/-2% of the input
rating from step 2. If within 2%, go to step 9. If not, adjust-
ment is required, proceed as follows:
A.
Turn boiler off
B.
Set up U-tube manometer or differential pressure gauge
for measuring manifold pressure, see Figure #17.
C.
Manometer or gauge must be able to read at least 0.0 to
3.0 inches water column of pressure, and resolve to at
least 0.1 inches water column.
D.
Turn boiler on.
E.
Manifold pressure has been nominally set at 2.5 inches
w.c. Manifold pressure and input rate must always be
measured with pressure regulator cover screw installed.
Cover screw must be removed for adjustment. Manifold
pressure reading will change (increase) when cover screw
is removed.
F.
After adjusting input rate, turn boiler off, remove ma-
nometer or pressure gauge, reinstall ⅛" plug on gas
valve. Turn boiler on.
9.
Restore all gas appliances that may have been shut off
(while measuring boiler input rate) to normal operating
conditions.
I.
Remove regulator cover screw on top of gas valve, and
insert an appropriate screwdriver into adjustment screw.
II.
Turn adjustment screw clockwise to increase input rate,
or counter clockwise to decrease input rate.
III.
Replace cover screw, or cover hole temporarily with
your finger to check new manifold pressure setting. Do
not set manifold pressure lower than 2.0 inches w.c. or
higher than 3.0 inches w.c. when adjusting input rate.
44