UTICA BOILERS UB95M-200 Installation, Operation & Maintenance Manual page 41

Gas-fired direct vent modulating hot water boiler
Table of Contents

Advertisement

Wiring Diagram 7 : Primary/Secondary Piping With Zone Valves And Domestic Hot Water (With Circulator)
AR822-II
T
T
24V
R
W
C
L2
L1/3 FACTORY
120
INSTALLED
VAC
JUMPER
APPENDIX A - BOILER PIPING AND WIRING
SWITCH LEGEND
ON
OFF
Yellow
Yellow
Black
White
120 VAC
5
6
6
N.O.
N.C.
RELAY
N.O.
N.C.
4
4
*BOILER
CIRC
*BOILER CIRCULATOR WILL RUN
WITH ALL CALLS FOR HEAT.
Note: a priority loop zone valve is used with this con guration
INDIRECT WATER
HEATER AQUASTAT
OR THERMOSTAT
ARGO AZ-4CP
CONTROL
X
X
STATUS
PRIORITY ON
PRIMARY PUMP
PRIORITY PUMP
X-X CONTACT
ZR ON
PRIMARY
PRIORITY
FROM BOILER
PUMP
PUMP
N
L
N
L
N
L
ZR ZC
AZ-4CP
41
TANK
CONTROL
T-STAT
T
T
T
T
T
T
ON
ZC ON
OPTION SWITCH
ZONE 2
PRI ZONE
ZONE 3
1
2
3
4
1
2
3
4
1
2
3
4
JUMPER
1
2
3
END
DO NOT USE
MOTOR
SWITCH
1
2
3 4
4 WIRE ZONE
VALVE ONLY
Boiler Control Panel
CH T1
L1
CH T2
L2
DWH T1
CH C1
DHW T2
CH C2
A1
DHW C1
A2
DHW C2
OUTDOOR
AIR SENSOR
T-STAT
T
T
ZONE VALVE/PUMP
PRIORITY
ZR-ZC
DPM-2
ZONE 4
1
2
3
4
Note: Install
wire jumper
between
terminals 3
and 4 when
END
using zone
MOTOR
SWITCH
valves
without an
end switch.
CH
CIRC
DHW
CIRC

Advertisement

Table of Contents
loading

Table of Contents