UTICA BOILERS UB95M-200 Installation, Operation & Maintenance Manual page 15

Gas-fired direct vent modulating hot water boiler
Table of Contents

Advertisement

Figure 6 -Roof Vent / Intake Terminations
Figure 7 - Concentric Vent Terminations
1" (26mm)
Maximum
Combustion
Air
8 - COMBUSTION AIR AND VENT PIPE
3" MINIMUM
SEPARATION
Vent
1" (26mm)
Maximum
* See Note
Below
Combustion
Air
*Must be less than 4" (102mm) or greater than
24"(610mm) Horizontal distance between end bells of each
air intake to prevent flue gas recirculation.
15
Roof Overhang
12" (300mm) Minimum
36"(915mm) Minimum
Maintain 12"(300mm)
Vent
clearance above highest
anticipated snow level or
grade

Advertisement

Table of Contents
loading

Table of Contents