Rheem GPH series Installation Instructions Manual page 23

For upflow, upflow/horizontal, and downflow induced draft gas furnaces
Table of Contents

Advertisement

FIGURE 18
UTEC 1028-928 CONTROL BOARD, TWINNING CONNECTION -- TWO-STAGE OPERATION
a099301
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gpj seriesGlh seriesGlj series

Table of Contents