GEH50DEEDSC
GeoSpring
hybrid water heater
Verification Checklist:
1
Tank location:
- Is room size less than 10x10x7 (700 cu. ft.)? If yes, Louvered door or similar ventilation is needed.
- Back of unit away from wall by 7 inches.
- Front of unit is free and clear.
- Is the water heater level? If no, add shims under the base of the unit.
2
Plumbing connections:
- Do not prevent air filter removal.
- No leaks after filling the tank with water, either when water is flowing or not.
3
Condensate lines are in place:
- Longer PVC pipe on lower drain nozzle and directed into a floor drain or a condensate pump.
4
T & P valve is working and drain line completed per local code.
5
Electrical connection does not prevent air filter removal.
Verify control panel displays 120°F (49°C) Hybrid Mode.
6
Verify filter is in place.
7
Normal startup—what to expect after pressing the POWER button
Elapsed time
Hybrid water heater actions
:00 to 2:00 minutes
Unit will go through self-check
2:00 to 10:00 minutes
Compressor and fan turn on and run for 8 minutes
10:00 to 30:00 minutes
Compressor and fan turn off, heating elements turn on for approximately
20 minutes.
30 minutes and beyond Upper element turns off, and compressor turns back on.
NOTE: Heat pump operating range is 45°F to 120°F.
For answers to your Monogram,
GE Profile
®
or GE
®
appliance questions, visit our website
at geappliances.com or call GE Answer Center
service, 800.626.2000.
®
Comments
This 2 minute off-time prevents compressor from being "short cycled"
(improved reliability).
This 8 minute period is used to ensure tank is full of water (dry fire prevention algorithm).
Quickly provides initial amount of hot water for user (~25 gallons).
Uses efficient heat pump for majority of heating.
Specification Revised 2/12