1. Remove the stand fixing screws (4 pcs.).
2. Remove the two terminal covers.
3. Remove the terminal section fixing screws (2 pcs.).
4. Remove the cabinet B fixing screws (8 pcs.).
5. Cabinet A is opend order of
6. Release the wire holders at 2 locations.
7. Peel off the tape.
8. Detach the connector from each PWB.
8
SC1203
7
Tape
8
SC1204
P1201
6
Wire holder
7
R/C, LED PWB
Tape
REMOVING OF MAJOR PARTS
to
, and detach the Cabinet B.
5-1
5-8
5-6
Cabinet A
5-7
5-8
Cabinet B
OPERATION PWB
8
8
P4001
P2001
SC1202
P6502
8
8
MAIN PWB
8
8
SC2002
SC3403
P701
TUNER PWB
8
P8401
8
8
P3302
P3601
P3502
8
P3701
P3301
P3603
P4004
8
8
7
Tape
4
5-3
4
5-4
5-5
Terminal
2
cover (S)
3
Stand
8
8
P6500
P6501
INVERTER PWB
8
9
LC-13B4U-S
LC-13B4U-B
4
5-2
2
Terminal cover (L)
4
5-1
1