CMO Service Operations
Training and Vendor Development
Multimedia Creation & Support
12.
LOWER BLOCK ASSEMBLY
1. Needed tools.
3. Be sure that the cable is correctly routed.
5. Place the Keymat in the A-Cover Assembly.
Service Manual 6125 RM-178 /6136 RM-106/-199
Page
30
(42)
CONFIDENTIAL
2. Feed the Micro Coax Cable Assembly connector through the slot
in the A-Cover Assembly.
4. Depress the end of the Hinge Module and connect the parts.
Ensure that the Hinge Module expands completely.
6. Check its correct position and orientation.
Copyright © 2006 NOKIA Corporation. All rights reserved.
Approved 4.0
MGR
15.Dec.2006