Preparations - White Rodgers P150 Install Manual

Table of Contents

Advertisement

1. PREPARATIONS

1.1 Check package contents
This package should contain the following items:
Thermostat
Mounting screws and wall anchors (x2)
2 AAA batteries
Terminal wire label stickers
Installation instructions
1.2 Gather tools
Required tools:
□ Flat-head Screwdriver □ Small pliers (needle-nose) □ Drill with 3/16" (4 mm) bit
Optional tools:
□ Wire cutters/stripper □ Hammer
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents