Bryant 577C Installation Instructions Manual page 10

Preferred 14 seer single--packaged air conditionerand gas furnace system with puron (r--410a) refrigerant single and three phase 1-1/2-5 nominal tons (sizes 018--060)
Table of Contents

Advertisement

NOMINAL
INTERNAL
IRON PIPE
DIAMETER
10
SIZE (IN.)
(IN.)
(3)
175
1/2
.622
(53)
360
3/4
.824
(110)
680
1
1.049
(207)
1400
1--- 1/4
1.380
(427)
2100
1--- 1/2
1.610
(640)
*Capacity of pipe in cu ft of gas per hr for gas pressure of 0.5 psig or less. Pressure drop of 0.5 ---in. wc (based on a 0.60 specific gravity gas). Refer to Table,
National Fire Protection Association NFPA 54.
{ This length includes an ordinary number of fittings.
1. Open all electrical disconnects before starting any service
work.
2. Remove horizontal (metal) duct covers to access vertical
(downflow) discharge duct knockouts in unit base.
3. Use a screwdriver and hammer to remove the panels in the
bottom of the unit base (See Fig. 10).
4. If unit ductwork is to be attached to vertical opening flanges
on the unit base (jackstand applications only), do so at this
time.
CAUTION
!
PROPERTY DAMAGE HAZARD
Failure to follow this caution may result in property
damage.
Collect ALL screws that were removed. Do not leave
screws on rooftop as permanent damage to the roof may
occur.
5. It is recommended that the base insulation around the
perimeter of the vertical return- -air opening be secured to
the base with aluminum tape. Applicable local codes may
require aluminum tape to prevent exposed fiberglass.
6. Cover both horizontal duct openings with the provided duct
covers. Ensure opening is air- - and watertight.
7. After completing unit conversion, perform all safety checks
and power up unit.
NOTE: The design and installation of the duct system must be in
accordance with the standards of the NFPA for installation of
nonresidence- -type air conditioning and ventilating systems, NFPA
90A or residence- -type, NFPA 90B; and/or local codes and
ordinances.
Table 2 – Maximum Gas Flow Capacity*
20
30
40
50
(6)
(9)
(12)
(15)
120
97
82
73
(37)
(30)
(25)
(22)
250
200
170
151
(76)
(61)
(52)
(46)
465
375
320
285
(142)
(114)
(98)
(87)
950
770
600
580
(290)
(235)
(183)
(177)
1460
1180
990
900
(445)
(360)
(302)
(274)
LENGTH OF PIPE FT (m)†
60
70
80
90
(18)
(21)
(24)
(27)
66
61
57
53
(20)
(19)
(17)
(16)
138
125
118
110
(42)
(38)
(36)
(34)
260
240
220
205
(79)
(73)
(67)
(62)
530
490
460
430
(162)
(149)
(140)
(131)
810
750
690
650
(247)
(229)
(210)
(198)
SUPPLY
DUCT
OPENING
Fig. 9 - - Supply and Return Duct Opening
DUCT COVERS REMOVED
Fig. 10 - - Vertical Duct Cover Removed
Adhere to the following criteria when selecting, sizing, and
installing the duct system:
1. Units are shipped for horizontal duct installation (by
removing duct covers).
2. Select and size ductwork, supply- -air registers, and
return- -air grilles according to American Society of Heating,
Refrigeration and Air Conditioning Engineers (ASHRAE)
recommendations.
3. Use flexible transition between rigid ductwork and unit to
prevent transmission of vibration. The transition may be
10
100
125
150
175
(30)
(38)
(46)
(53)
50
44
40
(15)
(13)
(12)
103
93
84
77
(31)
(28)
(26)
(23)
195
175
160
145
(59)
(53)
(49)
(44)
400
360
325
300
(122)
(110)
(99)
(91)
620
550
500
460
(189)
(168)
(152)
(140)
RETURN
VENT HOOD
DUCT
SHIPPING
OPENING
LOCATION
200
(61)
72
(22)
135
(41)
280
(85)
430
(131)
A05143
C99012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents