Portability Kit Installation; Tools Required; Wheel Installation; Foot Installation - Husky HUCA7000 Series Operator's Manual

Table of Contents

Advertisement

Available languages

Available languages

TOOLS REQUIRED: 7/16", 1/2" and 9/16" sockets and ratchets, block(s) of wood (minimum of 6" tall).
Refer to the parts list on pages 36-39.

WHEEL INSTALLATION

1. Block up end of generator opposite the fuel tank cap to install wheel kit.
2. Insert wheel spacer (item 39) into the center of the wheel (item 28).
3. Slide 3/8 x 4.25" bolt (item 32) and 3/8 washer (item 27) through the wheel (item 28), then through the wheel bracket on the carrier, with
the offset side of the wheel hub against the wheel bracket.
4. Thread 3/8 nyloc nut (item 33) onto the bolt and tighten to securely clamp the wheel assembly to the carrier.
5. Repeat above instructions for the remaining wheel.

FOOT INSTALLATION

1. Assemble the rubber feet (item 29) to the foot bracket (item 43) using a 1/4-20 x 1.5" bolt (item 50). Thread a 1/4 washer (item 36) and
a 1/4 nyloc nut (item 10) to the bolt to secure the assembly. Caution: Do not over tighten so that the foot material collapses.
2. Blocking up the engine side of the generator, place the foot bracket under the carrier channel. Thread a 5/16-18 x 1" bolt (item 42) with
a 5/16 wide washer (item 41) through the mounting holes and thread a 5/16 wide washer (item 41) and a 5/16 nyloc nut (item 13) to
the bolt to secure the foot bracket to the carrier.

HANDLE INSTALLATION

1. Place handle (item 25) and spacer (item 46) on carrier on same end as feet, as shown in the diagram.
2. Slide 5/16 x 2.25" bolt (item 26) and 5/16 washers (item 12) through handle and handle bracket as shown in diagram and secure with
5/16" nyloc nut (item 13). Tighten until handle is securely clamped to the carrier.
3. Repeat above instructions for the remaining handle.

LOCKING HANDLE

1. Attach the lanyards (item 30) to the release pins (item
34) and carrier as shown in the illustration.
2. To lock the handle (item 25) in the extended position,
align the holes in the handle brackets with the holes
in the carrier brackets and insert the release pins
(item 34).

PORTAbILITy KIT INSTALLATION

1
30
34
Tank removed for clarity.
8
2

Advertisement

Table of Contents
loading

Table of Contents