Installation; Unpacking Your Washing Machine; Removing The Packing Bolts - Proaction A105QW Installation & User's Instructions

Table of Contents

Advertisement

Installation

Unpacking your washing machine

Caution: 2 people are required
to unpack the washing machine,
it is recommended that gloves are
worn.
a: Carefully remove all packaging materials
including the foam base, dispose of correctly.
Note: When opened, water droplets may be
visible in the drum etc. this is normal as each
appliance is factory tested.

Removing the packing bolts

Important: The packing bolts are
designed to support the internal
components during transit, these
MUST be removed before use.
a: Loosen the screws by rotating
counterclockwise with a suitable wrench.
(1 & 2)
b: Remove the bolts by pulling them. (3)
c: When the transport bolts have been removed,
insert the plastic transport screw taps found in
the accessories bag into the holes. (4)
Removing the packing bolts
a: For your machine to work efficiently with
minimum vibration it should be settled on flat,
non-slippery, firm ground.
b: You can adjust the balance of your machine
by changing the positioning of its feet.
c: First, loosen the plastic adjustment nut. (5)
d: Adjust by rotating the feet upwards or
downwards. (6)
e: After the desired position has been reached,
tighten the plastic adjustment nut again by
rotating it upwards.
Note: Never put cartons, wooden blocks or
similar materials to balance the machine on
uneven ground.
Customer Helpline: 0845 600 4632
1
3
5
2
4
6
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A105qs

Table of Contents