Up/Down Frame Assembly; Loading Belt; Pulley Gear; Loading Gear - Zenith ABV341 Series Service Manual

Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY

PULLEY GEAR

LOADING BELT

PWB LOADING ASSEMBLY

UP/DOWN GUIDE

5. Up/Down Frame Assembly (Fig. 5-4)
Note
Put the Main Base face down(Bottom Side)
1) Release the Screw(S4)
2) Unlock the Locking Tab(L3) in direction of arrow and
then lift up the Up/Down Frame Assembly to separate
it from the Base Main.
Note
• When reassembling move the Up/Down Guide in direction
of arrow(C) until it is positioned as Fig.(C).
• When reassembling insert (A) portion of the Frame
Assembly Up/Down in the (B) portion of theUp/Down
Guide as Fig.(B)
6. Loading Belt (Fig. 5-4)
Note
Put the Base Main on original position(Top Side)
7. pulley Gear (Fig. 5-4)
1) Unlock the Locking Tab(L4) in direction of arrow(B) and
then separate the Pulley Gear from the Base Main.

LOADING GEAR

(L4)
(L6)
(S5)
(C2)

MAIN BASE

(A)
(L5)
(B)
FIG. (A)
(C)
(B)
UP/DOWN GUIDE
FIG. (C)
UP/DOWN GUIDE
(L3)
(L6)
MAIN BASE
(H1)
(S4)
(A)

UP/DOWN FRAME ASSEMBLY

(A)
(B)
FIG. (B)
UP/DOWN GUIDE
Fig. 5-4
8. Loading Gear (Fig. 5-4)
9. Up/Down Guide (Fig. 5-4)
1) Move the Up/Down Guide in direction of arrow(A) as
Fig.(A)
2) Push the Locking Tab(L5) down and then lift up the
Up/Down Guide to separate it from the Base Main.
Note
When reassembling place the Up/Down Guide as Fig.(C)
and move it in direction arrow(B) until it is locked by the
Locking Tab(L5). And confirm the Up/Down Guide as Fig.(A)
10. PWB Assembly Loading (Fig. 5-4)
Note
Put the Main Base face down(Bottom Side)
1) Release 2 Screws(S5)
2) Unkool the Loading Motor Connector (C2) from the
Hook (H1) on the Base Main.
3) Unlock 2 Locking Tabs(L6) and separate the PWB
Loading Assembly from the Base Main.
11. Base Main(Fig. 5-4)
5-4
(L6)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xbv343 seriesXbv342 series

Table of Contents