OPERATING PROCEDURES
1. Ensure that the base unit power switch is in the "OFF" position.
2. Plug in Tweezers wand and connect AC power cord to mains "In-let"
3. Flip the "TWZ/SIA" function switch on to the "TWZ" position.
4. Turn "Mains power switch" to "ON" position.
5. Press the key "▲"and choose the temperature you want to set.
6. When the temperature reaches to the desired temperature that the heating indicator
light will be flashed on and off to maintain the set temperature. The unit now is ready
for use.
7. Gently pick up and remove components while ensuring that a vertical pick up and
pull out motion is maintained.
Please note :
1. The tweezers temperature will be lower about 50℃ than the soldering iron
temperature at the same temperature setting.
2. Use only the approximately designed tips for the job to avoid unnecessary
component damage.
Fig. 2 Drawing of Tweezers & spares SMD tips for TWZ80
CAUTIONS:
REMEMBER, THE TIP IS HOT!
-
The tip and barrel of the solder wand will cause serious burns if they are allowed to
contact skin. Always return the solder wand to the safety holder after each use.
2MM
3MM
46-060102
46-060103
10MM
15MM
46-060110
46-060115
6
5MM
46-060105
20MM
30MM
46-060120
46-060130

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents