Installation; Pat Testing - Prem-I-Air EH1226 Manual

2 kw patio heater
Table of Contents

Advertisement

IMPORTANT
Installer and Users please note:
These instructions should be read carefully and left with the
user of the product for future reference.

INSTALLATION

To wall-mount: Referring to the diagram opposite, draw two
horizontal lines on the wall 90 mm (3½") apart, the lower line
more than 1500 mm (5') from the floor.
On the upper line, drill holes 70mm (2¾") from the centre
line, using a 6 mm (¼") masonry bit, and insert a wall plug.
On the lower line, drill a hole on centre line using a 6 mm
(¼") masonry bit, and insert a wall-plug.
Insert screws into the upper two holes and almost fully
tighten.
Hang the heater on the upper screws using the keyhole slots
on the back.
Insert a screw through the hole in the heater, just below the
power display window. This screw will fit into the lower hole.
Fully tighten the screw, and push the rubber plug (supplied)
into the hole to protect from water ingress.

PAT TESTING.

When used in an office environment, this product must be
safety-tested yearly by a qualified electrician (PAT Tested) in
order to comply with the Electricity at Work Regulations.
We recommend that it is PAT tested regularly when used in a
domestic environment.
Page 2

Advertisement

Table of Contents
loading

Table of Contents