Part 12 - Installation Checklist - Westinghouse WGR-076 Series Installation, Start-Up, Maintenance, Parts, Warranty

Table of Contents

Advertisement

38
Figure 27 - Replacement Parts

Part 12 - Installation Checklist

Before Installing
Is there enough space to ensure proper installation?
Does installation location allow for proper service clearances?
Are water and gas lines properly sized and set at proper pressures for the installation?
Is water heater location as near the exhaust vent / intake pipe terminations as possible?
Have combustible materials been cleared from the installation location?
Is there a drain close to the water heater?
Water Piping
Does water heater loop piping meet the minimum sizing requirements listed?
NOTE: Smaller piping will cause performance problems.
Has water chemistry been checked?
Does water chemistry meet requirements?
If water chemistry does not meet requirements, have treatment measures been put in place?
Has the system been cleaned and flushed?
Install Exhaust Vent and Intake Piping
Has the water heater been vented with the approved materials listed in this manual or to meet local codes?
Is air supply sufficient for proper water heater operation?
Is total vent piping length within the maximum vent length restriction listed in this manual?
Have venting lengths been minimized?
WHL-001 Rev. 3.16.15
Yes
No
Yes
No
Yes
No

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents